Renewable energy projects either planned or underway (yet to be completed) within Tasmania are tabulated below. This information will be updated as necessary.
Project |
Technology |
Unit^ |
Status |
| Utility/industrial scale | |||
| Musselroe Wind Farm, Hydro Tasmania | Wind | 168MW | Planning and other approvals obtained |
| Cattle Hill Wind Farm, NP Power | Wind | 300MW | Supplementary information to support environmental assessment provided August 2011 |
| White Rock wind farm (also known as Robbins Island) | Wind | ~ 400MW | EPA assessment guidelines finalised following close of public comment period on the draft |
| Hydro Tasmania upgrades that increase output from existing assets | Hydro | n/a | Various projects and timeframes |
| Enhanced Geothermal (hot rocks), KUTh Resources | Geothermal | n/a | Largest geothermal special exploration licences covers 12.360sq km. At June 2011 examining option and funding to drill smaller diameter holes to better quantify the inferred resource and energy potential |
| Enhanced Geothermal (hot rocks), Geopower Pty ltd | Geothermal | n/av | Exploration licence 4 892 sq km |
| Enhanced Geothermal (hot rocks), Geothermal Energy Tasmania Pty Ltd | Geothermal | n/a | Three exploration licenses covering 8 495 sq km |
| Biomass thermal power facility Bell Bay, Gunns | Bio-energy | ~80MW (to grid) |
Planning approvals obtained. Part of the overall pulp mill project |
| Distributed/embedded power generation, R&D/Demonstration and smaller scale projects | |||
| Biodigestor, Longford, IMP Environmental | Bio-energy | n/av | Proposal to process organic waste for fertiliser and power being assessed by EPA |
| Wind turbine Northern Tasmania | Wind | 225kW | Planning and other approvals being sought |
| Wind turbine, Northern Tasmania | Wind | 225kW | Planning and other approvals being sought |
| Solar panel on industrial building | Solar | 20kW | Planning and other approvals being sought |
| Various wind, mini-hydro, solar and biodigestor projects including on farms and in commercial buildings |
Various | Each <1MW | Early investigation and planning stage |
| Cellulosic ethanol plant, REDD Forests | Biofuel | Initially 0.6m to 1m dry tonnes pa feedstock | Negotiating long-term supply contracts for plantation feedstock and discussing fuel extraction technology options with international licensors |
| Biofuel from poppy and vegetable waste and potentially tallow, Macquarie Oil | Biofuel (B20% up to B100%) | Max capacity 15m ltrs pa | Current production forward contracted |
| King Island Renewable Energy Integration Program, Hydro Tasmania | Wind, Solar and biofuel R&D&Demo | n/a | Three year $40.9m program commenced December due for completion in 2013 |
| Optimal design for ocean wave power oscillating water column technology, Oceanlinx and AMC | Ocean wave R&D | n/a | Australian Research Council Industry Linkage grant of $342,000 over 3 years to 2014 |
| Potential pilot bioWAVETM installation off King Island, BioPower Systems Pty Ltd | Ocean wave R&D | n/av | Conducted preliminary investigations and site analysis |
| Potential pilot bioSTREAMTM (tidal flow) installation off Flinders Island, BioPower Systems Pty Ltd | Ocean tidal R&D | n/av | Conducted preliminary investigations, site analysis and site design |
| Investigate the unsteady operation of hydroelectric turbines, School of Engineering, UTas. | Hydro R&D | n/a | Australian Research Council Industry Linkage grant of $148,000 over three years to 2014 |
| Biochar for Tasmanian Eucalyptus Forestry Plantations | Bio-energy R&D | n/a | A joint School of Engineering and Agricultural Science Program 2011 to 2014 http://www.anzbiochar.org/projects.html#sixteen |
| Biochar for Orchards Soil Carbon Management | Bio-energy R&D | n/a | UTas/Tasmanian Institute of Agricultural Research http://www.anzbiochar.org/projects.html#fourteen |
^ MW = installed capacity